Zero Construction, Renovation, and Demolition Waste Plan

  1. Collection of personal information

    The personal information on this form is collected under the authority of the Freedom of Information and Protection of Privacy Act, section 33(c) and is managed in accordance with Part 2 of the (FOIP) Act. The information will be used for administrative purposes about the CRD waste program. If you have any questions about the collection of this information, contact the Town of Banff Operations Division at (403) 762-1240, at operations@banff.ca or by mail at P.O. Box 1260, Banff, AB T1L 1A1

  2. Zero Construction, Renovation, and Demolition Waste Program

    The Town of Banff strives to be a model environmental community, where everything we do is guided by a goal to protect this special place. Our community goal is to send zero waste to landfill by 2050. Waste generated by the construction, renovation, and demolition (CRD) sector makes up a significant volume of waste that could be recycled or reused, instead of being sent to landfill.

    All projects that require a building permit in Banff must adhere to strict waste management requirements, following zero waste principles. All recoverable materials must be separated for reuse or recycling. More information & how-to resources are available at https://Banff.ca/ConstructionWaste 

    Beginning in 2024 you will be required to pay a bond to demonstrate your commitment to zero waste. The bond will be calculated based on the building permit fee. You must reuse or recycle a minimum of 70% of materials generated by your project in order to receive your full deposit back. If you reuse or recycle less than 70% of materials, your refund will be calculated proportionately based on level of compliance.

  3. Contractor(s) Contact Details
  4. Residential or non-residential:
  5. Please estimate ‘total waste generated’ for the demolition phase of your project by multiplying ‘total square footage’ by the appropriate average for your project type. Please note that estimates provided are based on averages for waste generated during the demolition phase of a project (Source: MetroVancouver):

    Single Family: 51kg/sqft               

    Multifamily: 58kg/sqft                       

    Commercial: 69kg/sqft 

  6. Proof of Reuse, Recycling Plans

     *complete this section when submitting the Development Permit application.

    Will your project generate this material?

  7. Recommended option for waste management?
    • Asphalt - Recycle
    • Concrete - Recycle
    • Drywall - Recycle
    • White Wood - Recycle
    • Pressure Treated Wood - Recycle
    • Kiln-dried wood - Recycle for Biomass (ToB Waste Transfer Site)
    • Branches, scrub & brush - Recycle
    • Assorted metals - Reuse or recycle
    • Materials salvaged for re-use - Reuse
    • Landfill garbage - Landfill 
    • Other materials Reuse or recycle
  8. Please upload a drawing of the proposed locations for stream-separated Construction Waste Storage Containers on the site. 